Operational Planning Platform

Your business doesn't run on dates. It runs on labor hours.

Capasense schedules work based on real team capacity, tracks execution as it happens, and shows the live labor cost — so you always know what should be happening, what is happening, and what it will cost.

Plan work. Control labor. See profit — in real time.

capasense://runtime-schedule
FabricationAssemblyFinishingQCShipping
On Pace: 12At Risk: 3Overrun: 1
Live
The Core Problem

Why schedules fail

Most businesses plan work on a calendar. But work doesn't move because Tuesday arrived. It moves when someone spends hours doing it.

So the moment a task takes longer than expected:

Everything shifts

One delay cascades through every downstream task.

Crews collide

Multiple jobs compete for the same people at the same time.

Deadlines slip

Promised dates become meaningless guesses.

Profit disappears

Overruns compound silently until the job is closed.

This disconnect causes missed deadlines, overloaded teams, and surprise losses — not because the business lacks data, but because its tools cannot connect work, people, and cost while operations are still in motion.

67%of projects exceed budget due to
labor miscalculation

“And you only discover it afterward.”

Quote>Schedule>Work>Payroll>Accounting>Surprise
The Shift

Run your operation on effort — not dates

Instead of placing tasks on days, Capasense allocates real human hours. When work changes, the schedule adjusts automatically. Now the plan reflects reality — continuously.

Traditional

Calendar-Based Scheduling

Tasks placed on days. Static. Disconnected from reality. Breaks the moment anything takes longer than expected.

Overlaps detected. No resolution available.

Capasense

Runtime Scheduling

Work allocated by effort hours against real capacity. The schedule is alive — it adapts as reality unfolds.

All lanes balanced. Capacity utilized: 78%

QuoteSimulateExecuteAdaptKnow
Capabilities

What this gives you

Four connected capabilities that turn your operation from reactive to predictive.

Labor Control

What should people be doing right now?

  • Assign work based on available capacity
  • Balance departments automatically
  • Prevent overload and idle time

Your team always works on the most important executable task.

Throughput Visibility

Are jobs on pace?

  • See which tasks consume more hours than planned
  • Detect bottlenecks instantly
  • Recalculate completion dates automatically

Fix problems while work is still in progress.

Live Job Cost

Are we making money?

  • Labor cost accumulates as work happens
  • Projected job profit updates in real time
  • Compare estimated vs. actual at any point

No more waiting for accounting to find out.

Automatic Timecards

What do we pay?

  • Clock in/out tied directly to scheduled work
  • Accurate payroll reports generated automatically
  • Eliminate duplicate data entry

Track work once. Use it everywhere.

Operational Clarity

The daily questions you can finally answer

Can we take this job?

Simulate capacity before committing

When will it actually finish?

Live projected completion dates

Who should work on what today?

Auto-prioritized task assignments

Where are we losing hours?

Real-time overrun detection

What will this job cost?

Live labor cost accumulation

What do payroll hours look like?

Automatic timecard generation

How It Works

A simple mental model

Four phases. One continuous loop. The plan is never static — it evolves with every hour worked.

Before work begins
01

Plan

Match required work hours to available labor. See if you have capacity before committing.

During execution
02

Run

Track work as it happens. Time flows through the same system that scheduled it.

Continuous correction
03

Adapt

Schedule adjusts automatically. Overruns surface early. Future reshapes in real time.

After completion
04

Learn

Compare estimated vs actual. Estimates improve with every completed job.

Built For

Operations where people are the bottleneck

If your schedule lives in someone's head, this replaces it.

Custom Fabrication & Millwork

Complex builds with variable task durations and skilled labor constraints.

Trades & Installation

Field crews managed by capacity, not calendar guesswork.

Engineering Offices

Billable hours scheduled against real availability.

Job Shops & Manufacturing

Cell-based production where throughput depends on operator hours.

Project Delivery Teams

Multi-phase projects with cross-department dependencies.

Operational schedulingLive cost trackingOverrun detectionPayroll timecardsContinuous forecasting

One system — one source of truth.

You shouldn't discover what happened to a job after it's finished.

You should see it while you can still change it.

See your next week before it happens.